Description
UBC research and development laboratory with Ledcor Construction. We installed a BASF Mastertop SRS Flake floor system that is easily cleaned and esthetically pleasing. High temperature areas were given Ucrete to withstand boiling water an steam cleaning.
Year: 2014
Size (ft2): 38,000
Manufacturer: BASF Methyl Methacrylate & Polyurethane Cement